Solar Panel Installation at Allen & Orr

  • Writer: Cat Lund
    Cat Lund
  • Jul 18
  • 2 min read

Updated: Jul 21

Project Location: Doncaster

Date:  September 2024

Sector:  Solar & Battery Installation


Overview

Design to Build Solutions were appointed to deliver a solar panel installation at the premises of Allen & Orr in Doncaster. The project involved fitting a 49-panel solar array to generate renewable energy on-site and reduce the company’s reliance on grid electricity. The installation was completed in full compliance with current industry regulations and supports the client’s goal of becoming a more energy-efficient and environmentally responsible business.




Scope of Work

The project required a comprehensive renewable energy solution tailored to the site. This included planning, installation and commissioning of a fully integrated system designed to deliver consistent performance and long-term value.


A solar panel installation at the premises of Allen & Orr in Doncaster


Services Delivered

Design to Build Solutions installed 49 solar panels along with the necessary mounting structures to secure them in place. An inverter system was fitted to convert the DC electricity generated by the panels into usable AC power for the business. The system was then connected to the site’s existing electrical infrastructure. Once installed, the array underwent thorough testing and commissioning to confirm performance. As part of the handover, we provided all relevant documentation and training to ensure the client could operate and maintain the system with confidence.


Allen & Orr have been working closely with Design to Build Solutions for the last couple of years. We were introduced to Lee and from day one we had already decided that they were the guys for us. It proved to be one of the best decisions we have ever made. Very rarely do you come across such a professional organisation: the quality of service was amazing, the product perfect for our purpose, installation was to the highest standard, nothing was too much trouble and the after service second to none. We cannot rate them highly enough!

Phil Whiteley, Allen & Orr






Key Benefits

This project enables Allen & Orr to reduce their electricity costs by generating clean, renewable energy on-site. The installation aligns with their broader sustainability ambitions and contributes positively to their corporate environmental profile. With the potential for additional financial benefits through government incentives, the system also delivers strong long-term savings.


Reduced energy costs through reliable solar power generation

Improved sustainability by switching to a clean, renewable energy source

Potential financial incentives through available rebates and tax schemes

Significant long-term savings from decreased reliance on grid electricity

Enhanced corporate environmental credentials


By choosing Design to Build Solutions, Allen & Orr now benefit from a future-ready energy solution designed to support their business operations while helping to reduce their environmental impact.